If Mr Woods had been a little more precise in his wording Getting the location right, I would not have confused him with the rabid anti-motoring zealots who use such phraseology to try to make us all feel guilty about driving. As for the M25, it was desi

If Mr Woods had been a little more precise in his wording 'Getting the location right,'I would not have confused him with the rabid anti-motoring zealots who use such phraseology to try to make us all feel guilty about driving.

As for the M25, it was designed around the traffic projections of the mid-fifties and, when finally completed in 1986, was already 30 years out of date and immediately grossly overloaded.

BM, Stevenage